Discovery Tree Early Learning Centre
Client: Paul Caminiti
Architect: F2 Design
Constructive Group supported a full, turnkey fitout after structural construction, working with precast walls as well as in situ concrete flooring and roof.
A two-level building with a full rooftop terrace enclosed for safety.
The first construction job for our client, Constructive Group delivered the project ahead of schedule, (build complete in ten months), and left the client highly satisfied and potentially looking at additional sites.